Reserve Wastewater Treatment Plant Reserve, Louisiana
Client St. John the Baptist Parish
Size 28 Acres
The Reserve Wastewater Treatment Plant project upgraded an existing oxidation pond into a four-cell aerated lagoon with an equalization basin capable of treating 3.0 MGD. The complex tasks included site work, piling, underground piping, sloped paving, chlorine building, headworks structure, influent structure, effluent pump station, chlorination, sulphur dioxide structures, and the installation of mechanical equipment and piping, and electrical.