Bristow – Galliano Expansion Galliano, Louisiana

Client Bristow US LLC
Size 28,552 SF
Recognition: ABC Chapter Award of Excellence

Located in Galliano, Louisiana, this project entailed the expansion and renovation of the Bristow Galliano Heliport.
The project consisted of an existing terminal renovation, a new terminal addition – that more than doubled its size to 28,552 SF, two new S-92 hanger additions (15,312 SF), two new storage buildings (10,150 SF), a baggage drop off pavilion (2,250 SF), open gable addition (840 SF), miscellaneous site demolition/concrete paving, an expansion of their existing North limestone parking lot, and a temporary terminal in operation during terminal construction.